Call or text(888) 450-4097

Home / Services / Landscape and green waste / Deck removal

Deck demolition and removal, ready for the rebuild

Rotted boards, wobbly railings, a deck you are replacing: we tear it out and haul it away so the rebuild starts on a clear site.

Book online, and we will give you a call shortly.

A mini excavator and a skid loader clearing wood debris from a collapsed barn

What we tear out, and how

Planning a deck demolition and rebuild? We handle the first half. We take the old deck apart, load every board and haul it away, then rake and sweep the site so your builder starts on clear ground. We do not build the new deck.

Decks come apart from the top down. Railings and stairs come off first, then the decking boards, then the joists and beams. Two of us work with pry bars, saws and drivers, cutting long pieces to fit the truck or dump trailer. Big or raised decks may bring the heavy-duty setup, a skid loader and a mini excavator, when that is the safer way to clear them.

  • Wood and composite decking boards
  • Railings, balusters and stair sets
  • Joists, beams and ledger boards
  • Concrete footings and pier blocks, priced by weight
  • Built-in benches, planters and lattice skirting

Get it gone

Send photos of the deck. We confirm the price, tear it out and leave the site clear for your builder.

Before we come

  1. Clear everything off the deck: furniture, grills, planters and rugs.
  2. Have an electrician disconnect any lights or outlets wired into the deck. We do not do electrical work.
  3. If a hot tub sits on the deck, it needs its own plan; see hot tub removal.
  4. Decide whether the footings stay for the rebuild or come out, and tell us when you book.
  5. Send photos from the yard and from above so we can confirm the price.

Where the old deck goes

A deck is mostly wood and fasteners, sometimes with concrete underneath. Following Donate. Recycle. Dump., metal brackets, joist hangers and screws go to scrap metal recycling, and usable patio furniture can go to donation. Composite boards and treated lumber go where they are accepted, and only what cannot be recycled goes to a transfer station or landfill.

Old decks often hide cans of stain, sealer and paint underneath. We'll haul anything but paint and solvents, fuel and oil, chemicals and pesticides, propane tanks, asbestos, medical waste and ammunition; we tell you where those go instead. Pull them out before the crew arrives.

What deck removal costs

Once a deck is in pieces, its wood stacks tighter than you would expect. We price the job by the space that pile takes on the truck, from quarter-truck price: to confirm for a landing and stairs, and from full-truck price: to confirm for a big deck, with the teardown labor, loading and disposal included. Footings and pier blocks are concrete, priced by weight on site.

Send photos and we confirm a straight price before a single board comes up. Book online, and we will give you a call shortly. See deck and light demolition cost and light demolition and teardown.

Questions people ask

Do you rebuild decks?

No. We do the demolition and removal so the rebuild starts on a clear site. Your deck builder takes it from there.

Can you remove a deck attached to the house?

Yes. Tell us it is attached when you book. Any repair to the wall behind the ledger board is your builder's work.

What happens to the footings?

Tell us whether they stay or go. Concrete footings that come out are priced by weight on site.

Can you take the old patio furniture and grill too?

Yes. A grill takes about 10 cubic feet and a patio table about 10, so they add little to a deck job.